PROJECT: INSTALLATION OF R.O. UNITS AND PURIFICATION STATION 6 AT QASSIM
The Synchronizing panel will operate on an automatic mains failure system, so that when the main supply is interrupted on one or all phases (after an adjustable delay period) the generator sets will start-up together. After an initial warm-up period (adjustable) the generators will synchronize with each other by means of motorized circuit breakers or contactors onto a common busbar.
PROJECT: INSTALLATION OF R.O. UNITS AND PURIFICATION STATION 6 AT QASSIM
CUSTOMER: SAMNAN FOR TRADING & MAINTENANCE CO.
SUBJECT: MOTOR CONTROL CENTER (MCC) – ABB ArTu K
Next, the motorized change-over switch will be closed and the load connected to the main distribution box.