Category: Factory

May - 26
2024
WATER QUALITY IMPROVEMENT PROJECT

WATER QUALITY IMPROVEMENT PROJECT

PROJECT: WATER QUALITY IMPROVEMENT PROJECT-STRATEGIC NETWORK AND RESERVOIRS-AL HASA PROJECT EAMFCO has initiated efforts on a significant project with NWC to enhance water quality and treatment. This project involves the development of water infrastructure and further establishing its position as…

May - 20
2024
TANIA FACTORY

TANIA FACTORY

PROJECT: TANIA FACTORY Main distribution board is a distribution board that completes all the functions of a main electrical distribution for the supplied area assigned to it and where the voltage is measured for operating the electric supply system for…

May - 13
2024
WATER IMPROVEMENT FOR EASTERN PROVINCE

WATER IMPROVEMENT FOR EASTERN PROVINCE

PROJECT: WATER IMPROVEMENT FOR EASTERN PROVINCE Offers a high performance packaging solution for all your motor control needs, providing the advantages you need in your competitive environment. Motor control centers are in modern practice a factory assembly of several motor…

May - 06
2024
PP3 REFRIGERATION PLANT PROJECT

PP3 REFRIGERATION PLANT PROJECT

PROJECT: PP3 REFRIGERATION PLANT PROJECT Package Substations are all factory-assembled and tested the same high standard as our switchboards. They are designed and manufactured in order to satisfy the customer’s specific requirements. The package substation is a combination of the…

Apr - 28
2024
anjal national school

ANJAL NATIONAL SCHOOL

PROJECT: ANJAL NATIONAL SCHOOL System pro E power is the innovative ABB’s main distribution switchboard solution with rated current up to 6300A and short-circuit current up to 120kA.  Designed to easily fulfill all electrical installation requirements in terms of protection…

Apr - 15
2024
DAMMAM WATER QUALITY

DAMMAM WATER QUALITY-FAT

PROJECT: DAMMAM WATER QUALITY-FAT STAGE The Factory Acceptance Test (FAT) has been completed in the factory with the presence of NWC, Alkhorayef Water & Power Technologies and third party TÜV AUSTRIA.

Mar - 31
2024
DISTRICT COOLING PROJECT AVENUE MALL

DISTRICT COOLING PROJECT AVENUE MALL

PROJECT: DISTRICT COOLING PROJECT AVENUE MALL Motor Control Center technologies have surfaced that address evolving smart pumping system requirements. They protect pumping systems by simultaneously providing a new level of diagnostics, energy awareness and control, as well as by enhancing…

Mar - 17
2024
STC NEIDC-P3-JED002 DATA CENTER

STC NEIDC-P3-JED002 DATA CENTER

PROJECT: STC NEIDC-P3-JED002 DATA CENTER System pro E power is the innovative ABB’s main distribution switchboard solution with rated current up to 6300A and short-circuit current up to 120kA.  Designed to easily fulfill all electrical installation requirements in terms of…

Mar - 10
2024
JUBAIL NAVAL BASE

JUBAIL NAVAL BASE

PROJECT: JUBAIL NAVAL BASE Package Substations are all factory-assembled and tested. They are designed and manufactured in order to satisfy the customer’s specific requirements.  The package substation is a combination of the Ring Main unit, The Transformer and The Low-Voltage…

Mar - 03
2024

NOV 3RD INDUSTRIAL CITY

PROJECT: NOV 3rd INDUSTRIAL CITY The Main Distribution Panel Board is the most essential component of a Power Distribution System.  Although the submission of the electrical energy through a Power Distribution System also involves Sub Main Distribution Boards (SMDBs) and…